Outstanding Specification

A Specification without Compromise

HALO is designed to provide the highest quality accommodation, both stylish and practical in equal measure. The building has been developed to the highest specification with energy efficiency and sustainability considered a priority throughout.

  • DOUBLE HEIGHT RECEPTION WITH HIGH SPEED SECURITY TURNSTILES
  • FULL HEIGHT ATRIUM WITH FEATURE HELICAL STAIRCASE
  • FOUR PIPE FAN COIL AIR CONDITIONING SYSTEM
  • X.75M FLOOR TO CEILING HEIGHT
  • METAL TILE SUSPENDED CEILINGS
  • LED LIGHTING WITH PASSIVE INFRARED (PIR) SENSORS
  • 150MM FULLY ACCESSIBLE RAISED FLOORS
  • 1:8 SQ M OCCUPATIONAL DENSITY WITH 1:6 SQ M MEANS OF ESCAPE
  • FOUR X 13 PERSON PASSENGER LIFTS + GOODS LIFT.
  • 43 CAR SPACES INCLUDING 10 ELECTRIC CAR CHARGING POINTS WITHIN SECURE BASEMENT CAR PARK
  • 8 MOTORCYCLE PARKING BAYS WITHIN SECURE BASEMENT CAR PARK
  • 144 SECURE CYCLE SPACES
  • SPA QUALITY SHOWERS, LOCKERS AND DRYING ROOM

Schedule of Accommodation

Schedule [Net Lettable / sq ft ]

FLOORS SQ FT
GROUND LEVEL (PART)
Only Suite Remaining
8,200
GROUND (PART)
Under offer
4,397
LEVELS 01-02
Let to DeLoitte
29,525
LEVELS 03-07
Let to Osborne Clarke
73,991

NB: All areas are approximate and calculated in accordance with the RICS Code of Measurement Practice (6th Edition)

Ground Floor 8,200 sq ft

Basement Level

* One of the first offices building in the UK to achieve BREEAM Outstanding under the new 2018 BRE Regulations

MISREPRESENTATION ACT: The information is indicative and intended to act as a guide only.
These particulars should not be relied upon as accurately describing any of the specific matters described by any order under the Property Misdescription Act 1991.
The information does not constitute a contract or warranty. Customers are advised to contact the selling agent to ascertain the availability of any particular property.
Site design by Creation Partnership www.creation.design